ОАО “Stroyecologia” company has provided the power supply of mechanization of the construction of new metro station “Novokosino” 2018-04-27
ОАО “Stroyecologia” company (part of “Borodino” Constructing-Industrial Corporation of “Borodino” Group of companies) has performed the works for power supply of mechanization of the construction of new metro station (“Novogireevo-Novokosino” part of Kalininskaya line).
Electricity supply of the construction mechanization was effected by the biradiate scheme, total simultaneous power is 5000 kW.
When building the 10 kW cable line there were 4 closed passages performed by way of horizontally directed drilling under the Moscow Circle Motorway (MKAD), Nosovikhino Highway and Gorkovskaya Railway.
In the process of works there were two 10 kW cable lines channeled with the length of 2.300 m, the switch unit (RU-10kW) and two complete transforming stations of outside system (KTPN) with the capacity of 630 kW were installed. Besides there were 10 kW distributing nets cabled from RU-10 kW to KTPN-1 and KTPN-2, 150 m of length each, the full complex of assembling and start-up works has been performed.
» News
2018-04-27
ОАО “Stroyecologia” company has provided the power supply of mechanization of the construction of new metro station “Novokosino”
On the March 25th, 2012 there was a meeting held between President of “Borodino” Group of Companies Mr. Tigran Nersisyan and Minister of Commerce and Industry of Botswana Mrs. Makrgato–Malesu.
The management of Savelovo plant met the delegation from the Federal Republic of Nigeria headed by the Ambassador of Republic of Nigeria His Excellency Timothy Mai Shelpidi and the Minister of Trade, Investments and Economics Onesimus Yanya Atanze
The meeting of “Zarubezhstroy” Corporation management and Extraordinary Plenipotentiary Ambassador of the Democratic Republic of Congo – Mr. Moïse Kabaku Mutshail.